Making Pre-installation Checks
The following conditions are required for the installation site.
It is recommended to make a preliminary inspection of the installation site efore delivering
the equipment to the user.
Checking the Power Supply
The equipment must e connectale to the outlet that can supply the rated voltage +10/-15%
at the specified ampere or higher.
120V - 230V 1A
6
Installation > Making Pre-installation Checks > Checking the Installation Space
6
Installation > Making Pre-installation Checks > Checking the Installation Space
Checking the Installation Space
The following illustration describes the necessary space for the
maintenance.
1000 mm or more
1105 mm
1000 mm or more
6-2
6-2