Verifying The Installation - Huawei UPS2000-G Series Quick Manual

Hide thumbs Also See for UPS2000-G Series:
Table of Contents

Advertisement

UPS2000-G-2KRTS
Mains input
UPS2000-G-3KRTS
Mains input
4
Installing the Optional Card to the UPS
For the installation procedure, see the RMS-SNMP01B SNMP Card User Manual, RMS-RELAY01B
User Manual, RMS-MODBUS01B User Manual. The installation method for 1 kVA, 2 kVA UPS, and
3 kVA UPS is the same. The figures below are based on the 3 kVA UPS.
UPS2000-G-3KRTS
Optional Card
5

Verifying the Installation

No.
Item
1
Cable routing
2
Cable connections
3
Cable connections for USB ports and
network ports
4
Labels
5
Ground cable connection and
upstream circuit breaker for the UPS
6
Distances between cable ties
7
Operating environment
UPS2000-G-2KRTL
UPS2000-G-3KRTL
UPS2000-G-3KRTL
Acceptance Criterion
Cable routing meets engineering requirements.
Power cables and battery cables are tightened to
specified torques using a torque wrench,
connected correctly, and free of damage.
Cables to USB ports and network ports are
connected correctly and securely.
Labels are neatly attached to both ends of each
cable, and the information on the labels is concise
and understandable.
The ground cable is securely connected to the
ground bar in the equipment room. An upstream
circuit breaker of proper specifications is installed
on the UPS input end.
Distances between cable ties are the same, and
no burr exists.
Clean the conductive air and other sundries.
6
Mains input
Mains input
Optional Card