To start the link test, select
CP 1515 Manager window. This will display the window pictured in
14 Link Test
Window.
Across the top of the Link Test window, you can see:
•
The radio channel on which both devices are communicating.
•
The name of your computer (This Station),
•
The name of the link test partner (Test Partner), and
•
The quality of the connection.
Industrial Ethernet Wireless LAN RLM Manager, CP 1515 Manager
C79000-G8976-C171-01
in the
menu of the main
Figure
75