(Hpfb) - Toshiba strata DK8 Installation Instructions Manual

Hide thumbs Also See for strata DK8:
Table of Contents

Advertisement

INSTALLATION-OK8 KSU & PC8
SECTION 100-816-204
MARCH 1993
2.20 Mounting
the Key Set-vice
Unit
1)
Make sure the power supply switch is turned
OFF.
2)
Place the Key Service
Unit on the desired
location on the mounting
surface and markthe
location of the four screw holes (there is one on
each corner). See Figures 4-1 and 4-2.
NOTE:
Make
sure the location
of the Key Service
Unit meets
the minimum
clearance
require-
ments
specified
in Figure 2- 1 in Chapter
2.
3)
4)
5)
6)
7)
8)
Drill holes on these marks.
Secure screws approximately
two thirds of the
way into the top two holes on the mounting
surface.
Hang the unit from the top two screws
and
then secure
the screws
completely
into the
mounting
surface.
Finish securing
the unit to the mounting
sur-
face by completely
screwing
the bottom
two
screws into the wall.
Ground
system according
to Chapter
2, Para-
graph 4.
Connect
applicable
wiring
(modular
CO line
cords, 25-pairamphenol
connectorcable,
etc.)
to the Key Service
Unit. Route the wiring as
shown in Figure 4-4, and then fasten wiring to
the unit with the tie wraps that come with the
Key Service Unit. (See Section
100-8-l 6-208,
for additional
wiring information.)
NOTE:
Figure 4-4 shows
cables routed
to the right;
they may a/so be routed to the left, depending
on the location
of the MDF.
9)
10)
11)
If the Reserve
Power
Battery
and Charger
(HPFB)
is going to be installed,
refer now to
Paragraph
2.30. If not, proceed
to Step 10.
Plug the AC power
cable
into an outlet and
then turn ON the DC power supply switch.
Reinstall
the front cover onto the Key Service
Unit.
2.30 Installing
the Reserve
Power
Battery
and Charger
(HPFB)
(Figure
4-4)
1)
2)
3)
4)
5)
6)
Place the HPFU directly above the DK8 KSU.
Mark the location of the two screw holes, then
drill holes.
Screw
the two
screws
two-thirds
into the
mounting
surface.
Hang the HFPU on the screws then tighten the
screws
into the mounting
surface.
Plug the first HPFU connector
into BATT con-
nector on the right side of the KSU.
Connect
a ground
wire from the HPFB "FG"
screw to the DK8 QPSU8
screw
labeled
"HPFBG." The ground wire can be fed through
the opening
by the AC power cord (see Figure
4-3).
NOTE:
The DK8 should
be plugged
into AC power
and the DC power
switch should
be turned
on. The HFPU will not start to operate
if AC
power is not available
during the initial instal-
la tion.
7)
The 24V LED on the HPFU should
light. If it
does not light, press the battery
OFF switch
with a pencil point or other small-tipped
object.
8)
Dress and tie-wrap
the HPFU cables per Fig-
ure 4-4.
9)
To mount a second
HPFU, repeat steps 1-4,
then plug the second
HPFU connector
in the
first HPFU and connect
an FG wire between
each HPFB FG screw.
10) To test the HPFU, remove
the DK8 AC plug
from the AC outlet. The DK8 AC LED will go
out but the DK8 DC LED remains
on, also the
system
remains
in normal working
order and
the HPFU 24V LED remains
on.
11) If it is desired
to turn off the HPFU (after loss
of AC power),
use a pencil
or other
sharp
object to press the Battery
Off switch.
CAUTIOM'
Once the HPFU is turned off or unplugged
(During AC power loss) it will not operate
again until AC power is restored to the
DKB KSU.
4-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Strata dk16

Table of Contents