Operation; Switching On The Storage System - Bosch BPT-S 5 Hybrid User Manual

Solar inverter
Hide thumbs Also See for BPT-S 5 Hybrid:
Table of Contents

Advertisement

Available languages

Available languages

English
Bosch Power Tec GmbH
4

Operation

4.1

Switching on the storage system

Prerequisites
Measurements are carried out according to the
standard DIN EN 62446.
Procedure
1. Open the housing door
2. Turn the On/Off switch to On
On/Off switch (1)
4.1:
3. Close the housing door on the storage system
The storage system program starts up
automatically. This may take some time: A rotating
hourglass is displayed.
You will hear several clicking sounds.
Only during the initial commissioning of the
storage system: The commissioning wizard
launches.
4. Follow the on-screen instructions of the
commissioning wizard
Info
Once you have completed the instructions in the
commissioning wizard, this is not repeated when the
system is restarted.
The storage system has been switched on.
(1)
Storage system | User manual
Operation | 37

Advertisement

Table of Contents
loading

Table of Contents