14
AP-7131 Access Point: Installation Guide
a. Connect a RJ-45 Ethernet cable between the network data supply (host) and the AP-7131
GE1/POE or GE2 port.
b. Verify the power adapter is correctly rated according the country of operation.
c. Connect the power supply line cord to the power adapter.
d. Attach the power adapter cable into the power connector on the AP-7131.
e. Attach the power supply line cord to a power supply.
CAUTION
5. Verify the behavior of the AP-7131 LEDs. For more information, see "
page 19.
6. Align the bottom of the ceiling T-bar with the back of the AP-7131.
7. Orient the AP-7131 chassis by its length and the length of the ceiling T-bar.
8. Rotate the AP-7131 chassis 45 degrees clockwise.
9. Push the back of the AP-7131 chassis on to the bottom of the ceiling T-bar.
Do not actually connect to the power source until the cabling portion
of the installation is complete.
" on
LED Indicators