Toro Groundsmaster 4000?D Service Manual page 213

Hide thumbs Also See for Groundsmaster 4000?D:
Table of Contents

Advertisement

PRELIMINARY – For Toro Distributor and Toro Company use only.
Removal (Fig. 2)
1. Park machine on a level surface, lower cutting units,
stop engine, engage parking brake and remove key
from the ignition switch.
2. Remove front cutting deck (see Front Cutting Unit in
Chapter 8 − Cutting Units).
When changing attachments, tires or perform-
ing other service, use correct jacks and sup-
ports. Make sure machine is parked on a solid,
level surface such as a concrete floor. Prior to
raising machine, remove any attachments that
may interfere with the safe and proper raising of
the machine. Always chock or block wheels. Use
jack stands to support the raised machine. If the
machine is not properly supported by jack
stands, the machine may move or fall, which
may result in personal injury.
3. Chock rear wheels and jack up front of machine.
Support machine on jack stands.
4. Remove front wheel next to lift arm that is being re-
moved.
5. Remove cap screw, washers and lock nut that se-
cure lift cylinder pin to lift arm. Remove pin and separate
lift cylinder and lift arm.
6. Remove lock nut that secures lift arm pin. Support lift
arm and slide pin from frame and lift arm. Remove lift
arm from frame.
7. Remove height−of−cut chain, ball joint mount and
ball joint from removed lift arm as required.
Installation (Fig. 2)
1. Position lift arm to frame and insert lift arm pin. En-
gage roll pin into frame slots and install lock nut on pin.
Torque lock nut from 60 to 70 ft−lb (81 to 94 N−m).
2. Align lift cylinder with lift arm. Slide pin through lift
arm and cylinder end. Secure pin with cap screw, wash-
ers and lock nut.
3. Install front wheel assembly.
4. Lower machine to the ground.
5. If height−of−cut chain u−bolt was removed from lift
arm, assemble u−bolt so that threaded portion extends
0.870" (22.1 mm) above mounting plate on lift arm (Fig.
3).
Groundsmaster 4000−D
CAUTION
6. If removed, install ball joint to lift arm. Distance from
end of lift arm to center of ball joint should be from 2.210"
to 2.390" (56.1 to 60.7 mm) (Fig. 4). Make sure that ball
joint is horizontal and that stud is centered in ball joint.
Torque ball joint jam nut from 150 to 175 ft−lb (203 to
237 N−m).
7. Install ball joint mount to ball joint with slotted hex nut.
Torque nut from 90 to 100 ft−lb (123 to 135 N−m) while
aligning cotter pin holes. Install cotter pin.
8. Install front cutting deck (see Front Cutting Unit in
Chapter 8 − Cutting Units).
9. Lubricate lift arm grease fittings.
10.After assembly is completed, raise and lower the cut-
ting deck to verify that hydraulic hoses and fittings do not
contact anything.
11. Check height−of−cut and deck pitch adjustment.
1
2
1. U−bolt
2
1. Lift arm
Page 7 − 5
0.870"
(22.1 mm)
Figure 3
2. Height−of−cut chain
1
2.210" to 2.390"
(56.1 to 60.7 mm)
Figure 4
2. Ball joint
Chassis

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents