Table 1.150 Display Items And Setting Items Of [Schedule Control] Window; Table 1.151 [Schedule Control] Window Buttons - Fujitsu PRIMEQUEST 2000 Series Tool Reference

Hide thumbs Also See for PRIMEQUEST 2000 Series:
Table of Contents

Advertisement

MMB Web-UI (Web User Interface) Operations
1.7 [System] Menu for PRIMEQUEST 2800B2/2800B
If the maintenance work (either Hot System Maintenance, Warm System Maintenance or Cold System
Maintenance) of the system executed in the schedule execution time, the scheduled operation does not
execute the power operation of the system.
If the schedule overlaps on the same day, it is processed according to the following priority levels.
Special > Monthly > Weekly > Daily
Daily: Schedule executed every day
Weekly: Schedule executed every week
Monthly: Schedule executed every month
Special: Schedule executed on specific day every year
Moreover, if the Power On and Power Off is specified at the same time, the priority is given to Power Off.
Because System does not do Power On in Power On Delay, Schedule Power Off is disregarded. Moreover,
when OS does not accept the Shutdown demand, Power Off is not done.

TABLE 1.150 Display Items and Setting Items of [Schedule Control] Window

Items
Schedule Control
Number of schedules

TABLE 1.151 [Schedule Control] Window Buttons

Buttons
Apply
When the [Apply] button is clicked, the schedule operation information for the system is set.
Cancel
When the [Cancel] button is clicked, the browser returns to the original status without setting the
schedule operation information for the system.
(1)
Menu Operation
[System] ‐ [Schedule] ‐ [Schedule Control]
(2)
Window Operations
1.
Specifies whether schedule operation has to be carried out by Radio button for system.
2.
Click the [Apply] button.
Sets whether schedule operation is done for system.
On
Off
Default setting is Off.
Displays the number of schedules that are set.
304
Description
Description
CA92344-0539-04

Advertisement

Table of Contents
loading

Table of Contents