Download Print this page

Airflow QuietAir 100 Installation And Operating Instructions

Axial fan

Advertisement

Quick Links

Warranty:
Applicable to units installed and used in the United Kingdom. Airflow's Warranty covers the QuietAir fan for TWO years. The Warranty can be upgraded to THREE years from date of
purchase against faulty material or workmanship by registering on our web site at www.airflow.com.
The Warranty covers the product only and not the installation cost..
In the event of any defective parts being found, Airflow Developments Ltd reserve the right to repair or at our discretion replace without charge provided that the unit
1. Has been installed and used in accordance with the fitting and wiring instructions supplied with each unit
2. Has not been connected to an unsuitable electrical supply
3. Has not been subjected to issue, neglect or damage.
4. Has not been modified or repaired by any person not authorised by Airflow Developments Ltd.
5. Has been installed in accordance with latest Building Regulations and IEE wiring regulations.
Airflow Developments shall not be liable for any loss, injury or other consequential damage, in the event of a failure of the equipment or arising from, or in connection with, the
equipment excepting only that nothing in this condition shall be construed as to exclude or restrict liability for negligence.
This warranty does not in any way affect any statutory or other consumer rights.
irflow Developments Limited
Aidelle House, Lancaster Road, Cressex Business Park
High Wycombe, Buckinghamshire
HP12 3QP, United Kingdom
E-mail: info@airflow.com
Telephone: +44 (0) 1494 525252
Facsimile: +44 (0) 1494 461073
airflow.com
Installation and Operating Instructions
Quiet ir 100/120mm xial Fan
MODEL:QT 100HT - Two Speed Fan (75/90m
QT 120HT - Two Speed Fan (150/170m
with Delay Start, Automatic
Humidity control and Timer
• Low Energy
• Whisper Quiet
• Long Life
• Extra Safe
• Delay Start
9041552 Issue 2 01/13
3
/hr)
3
/hr)

Advertisement

loading
Need help?

Need help?

Do you have a question about the QuietAir 100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Airflow QuietAir 100

  • Page 1 • Low Energy Airflow Developments shall not be liable for any loss, injury or other consequential damage, in the event of a failure of the equipment or arising from, or in connection with, the equipment excepting only that nothing in this condition shall be construed as to exclude or restrict liability for negligence.
  • Page 2 Installation and Operation Instructions Quiet ir 100HT & Quiet ir 120HT Contents Important information CH PTER 1 To ensure safety and correct operation please read and observe the following instructions carefully before proceeding. The electrical connection must be fully isolated from the supply up to the final assembly ! Keep the installation and INST LL TION ND operating instructions as a reference at the device.
  • Page 3 Installation and Operation Instructions Installation and Operation Instructions 1.10 Electrical connection Wall or ceiling installation W RNING ll work must be carried out with the equipment fully isolated from the power supply. The electrical connection are to be carried out in accordance with the relevant wiring diagram and are only to be done by a certified elec- trician.
  • Page 4 Installation and Operation Instructions Installation and Operation Instructions Electrical connection Wiring diagram overview Internal functional principle / Jumper position CH PTER 4 SS-931 Quiet ir 100HT - 75(90)m Connection client Quiet ir 120HT - 150(170)m ELECTRIC L CONNECTION ll work must be carried out with the equipment fully isolated from the power supply. The electrical connection W RNING is to be carried out in accordance with the relevant wiring diagram and are only to be done by a certified electrician.

This manual is also suitable for:

Quietair 120Quietair qt 100htQuietair qt 120ht