Download Print this page
Myson T6 Series Installation Manual

Myson T6 Series Installation Manual

Centrally connected radiator
Hide thumbs Also See for T6 Series:

Advertisement

T6 Radiator Series 
Installation Guide 
Revised 1/14         
T6-T
T6 - CENTRALLY CONNECTED RADIATOR
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the T6 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Myson T6 Series

  • Page 1 T6 Radiator Series  Installation Guide  Revised 1/14          T6-T T6 - CENTRALLY CONNECTED RADIATOR...
  • Page 2: Table Of Contents

    The remedy in all cases shall be to repair or replace the product at Myson’s discretion upon verification of a factory defect. If replacement is required, and an exact replacement product is no longer available, Myson reserves the right to furnish a similar product of equal value.
  • Page 3: Before You Begin

    Position radiators away from the circulating pump to avoid either excess pressure that could force water out the air vent or suction which cold draw air into the system. The preferred positioning for the T6 radiator is below a window where it can minimize downdrafts from glazed areas.
  • Page 4 Center Connections PIPING CONSIDERATIONS T6 radiators are to be connected to one of the following piping systems: Home Run, Two Pipe Reverse Return, or Monoflo. See page 8 for basic illustrations. A limited number of T6 radiators may be connected in series using “H” Series By-Pass Valves. The circuit must be limited to 2 GPM Maximum.
  • Page 5 Radiator T6 Series  Center Connections (cont)  Swapping the right-hand side built-in valve to the left-hand side is no problem at all at any time. Radiators are delivered with protective caps. After removing the protective cap (pos. A) the following thermostat heads can be fitted directly to the built-in v alve (pos.
  • Page 6: Side Connections

    Center connections MUST be used in order for the internal distribution tubing and the built-in thermostatic valve to function. The T6 IVC Radiator is designed to be connected using the bottom connections. If necessary the radiator may be installed using the side tappings although a better alternative is to use Myson’s Select Series Radiators.
  • Page 7 Should a homeowner without such knowledge or skill take it upon him/herself to attempt the installation, Myson will not be responsible for any damages, injuries or unsatisfactory performance of the Myson product used.
  • Page 8: Optional Piping Arrangements

    T6 Radiator Series MYSON Optional Piping Arrangements The following drawings are general examples. They are diagrammatic only. Consult a certified heating professional for your specific application. General information on the use of Monoflo tees: • Scoop type is placed on the supply •...
  • Page 9: Wall Bracket Installation

    T6 Radiator Series Solid Wall Bracket Installation ATTENTION: For the correct installation of radiators it is essential that the fixing of the radiator is carried out in such a way that it is suitable for intended use AND predictable misuse. A number of...
  • Page 10 NOTE: For mounting instructions of the T6 radiator using the new style EZ brackets please refer to the instructions included with the brackets. Many MYSON products are in excess of 70 pounds. Care should be taken to have help to lift larger radiators into place to avoid lifting injuries.
  • Page 11: Diverter Valve Installation

    T6 Radiator Series “H” Diverter Valve Installation MYSON T6 DIVERTER VALVE SYSTEM When using “H” style diverter valves to connect multiple radiators in series, it is necessary to size the downstream radiators based on the lower inlet water temperature at each radiator caused by the mixing of return water.
  • Page 12 T-6 Radiator Series H -Valve Dimensions HV-S Twin Entry By-Pass valve - Straight 2" 22mm BSP 2 3/8" Turn stop flow to radiator turn on both sides. CLOSE OPEN standard: adapters to 1/2" copper tube optional: adapters to 1/2" 3 3/8" HV-A Twin Entry By-Pass valve - Angle 2"...
  • Page 14: System Start-Up & Maintenance

    T6 Radiator Series System Start-Up & Maintenance Failure to flush system of debris and flux may cause premature radiator failure, which can result in leaks and property damage NOT covered under the Myson Warranty. SYSTEM START-UP Step 1 Fill and vent the system.
  • Page 15 T6 Radiator Series MYSON Notes...
  • Page 16 Myson T6 Radiator         Installation Manual 6/2012     MYSON INC. 948 Hercules Drive, Suite 5, Colchester, VT  05446   T 800.698.9690 F 802.654.7022   www.mysoninc.com ...