Preparation (Step 1 Connection/Installation)
1-1 The flowchart of installation work for camera
Getting Started
Caution
Attachment of a embedded cover in the ceiling (recess bracket) may be mandatory in certain
regions. If this is so, ensure that the embedded cover (recess bracket) is securely attached
☞
before installing the camera.(
Page16)
1. Preparation
Mount to the ceiling
Mount the electric box to
☞
(
Page 16)
the ceiling (
Open a hole on the
Open a hole on the
☞
ceiling (
Page 16)
ceiling (
Mount to the electric box
☞
(
Page 25)
☞
Pull out the cables from the ceiling (
Attach the safety wire to the camera unit (
☞
Remove the dome cover (
Page 17)
Do the wiring at the end of the alarm cable (
☞
Insert the CF card (
Page 17)
14
Pull out the cables aside
☞
Page 25)
☞
and mount (
Page 26)
☞
Page 25)
Page 16)
☞
Page 16)
☞
Page 17)
Pass the supplied cable
under the plate for
depressing cables.
☞
(
Page 26)
2. Installation
Mount to the ceiling
Mount the electric box to
☞
(
Page 16)
the ceiling (
Mount the safety wire to place which is firm such as ceiling (
☞
Connect the video signal cable (
Page 20)
☞
Connect the LAN cable (
Page 20)
☞
Connect the alarm signal cable (
Page 20)
☞
Connect the input power cable (
Page 20)
☞
Wind the cables with tape (
Page 21)
Face the camera towards the direction for shooting (
Mount the camera to
Mount the camera to the
☞
the ceiling (
Page 21)
electric box (
3. Adjustment of the camera's angle of view
☞
Connect to the monitor (
Page 23)
☞
Adjust the lens and camera angle (
☞
Mount the dome cover (
Page 24)
Pull out the cables aside
☞
Page 25)
☞
and mount (
Page 26)
☞
Page 20)
Bundle the cables and
pass them through the
☞
wire clamp (
Page 26)
☞
Page 21)
Mount the camera to
☞
☞
Page 25)
the ceiling (
Page 21)
Page 23)
15