The Flowchart Of Installation Work For Camera - JVC VN-C205 Instructions Manual

Fixed dome network camera
Table of Contents

Advertisement

Preparation (Step 1 Connection/Installation)

1-1 The flowchart of installation work for camera

Getting Started
Caution
Attachment of a embedded cover in the ceiling (recess bracket) may be mandatory in certain
regions. If this is so, ensure that the embedded cover (recess bracket) is securely attached
before installing the camera.(
Page16)
1. Preparation
Mount to the ceiling
Mount the electric box to
(
Page 16)
the ceiling (
Open a hole on the
Open a hole on the
ceiling (
Page 16)
ceiling (
Mount to the electric box
(
Page 25)
Pull out the cables from the ceiling (
Attach the safety wire to the camera unit (
Remove the dome cover (
Page 17)
Do the wiring at the end of the alarm cable (
Insert the CF card (
Page 17)
14
Pull out the cables aside
Page 25)
and mount (
Page 26)
Page 25)
Page 16)
Page 16)
Page 17)
Pass the supplied cable
under the plate for
depressing cables.
(
Page 26)
2. Installation
Mount to the ceiling
Mount the electric box to
(
Page 16)
the ceiling (
Mount the safety wire to place which is firm such as ceiling (
Connect the video signal cable (
Page 20)
Connect the LAN cable (
Page 20)
Connect the alarm signal cable (
Page 20)
Connect the input power cable (
Page 20)
Wind the cables with tape (
Page 21)
Face the camera towards the direction for shooting (
Mount the camera to
Mount the camera to the
the ceiling (
Page 21)
electric box (
3. Adjustment of the camera's angle of view
Connect to the monitor (
Page 23)
Adjust the lens and camera angle (
Mount the dome cover (
Page 24)
Pull out the cables aside
Page 25)
and mount (
Page 26)
Page 20)
Bundle the cables and
pass them through the
wire clamp (
Page 26)
Page 21)
Mount the camera to
Page 25)
the ceiling (
Page 21)
Page 23)
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vn-c205u

Table of Contents