10. Air Funnel Set B (MGC-021008-20)
Parts List
No.
PART No.
1
2
3
4
5
6
7
8
Installation
1. Installing the Primary Funnels
Screw on the Primary funnels on the throttle body. Put only the 4 lower screws like on the
photo. Use the short screws (30 mm).
2. Installing the Supports
Install the supports onto the levers.
Don't forget to put the plastic rings (From STD) into the holes.
Support L
Plastic
ring
PART NAME
SUPPORT L
SUPPORT R
UPPER LEVER
UNDER LEVER
PRIMARY FUNNEL L
PRIMARY FUNNEL R
SECONDARY FUNNEL
BOLT
Upper lever
Under lever
Lever Assembly
– 12 –
Q'TY
REMARKS
1
1
1
1
1
1
1
4
Support R
Plastic
ring