GE 400 User Manual page 59

Sg series 400 & 500 kva / 480vac ul / s2
Hide thumbs Also See for 400:
Table of Contents

Advertisement

2
Close UPS Output Switch Q1 (Pos. I) on first Unit.
Rectifiers start automatically, blinking LED 3 (Rectifier ON) indicates Soft-start.
At the end of Rectifier Soft-start, the LED 3 (Rectifier ON) remains lit.
Synoptic Diagram of first unit
3. Connect the Battery on first Unit by closing (Pos. I) its External Battery Switch or Fuses.
Attention: to check the right DC polarities on both side of the switch/fuse holder!
LED 4b (Charging Battery) should be lit indicating battery charge.
ATTENTION !
Before performing this operation, the LED 3 (Rectifier ON) must remain lit, thus
indicating that the DC-Link has reached floating voltage (540Vdc)!
4. Repeat the procedures 2 and 3 for each next Unit.
When closing UPS output switch Q1 on the last unit of the Parallel System, the Automatic Bypass of all
Units connects to the Load.
The Synoptic Diagram, on all UPS units, must display the status "LOAD SUPPLIED BY AUTOMATIC BYPASS".
Synoptic Diagram of first unit
5. Insert the Inverter by pressing the "Inverter ON" ( I ) key on first unit.
Soft-start of Inverter, indicated with blinking LED 5 (Inverter available).
At the end of Soft-start the LED 5 (Inverter available) remains lit.
In case of sufficient output power, the output will transfer to Inverter.
LED Alarm turn Off and the LED Operation must be lit.
Synoptic Diagram of first unit
Modifications reserved
OPM_SGS_USM_M40_M50_2US_V010.doc
Synoptic Diagram of other units
Synoptic Diagram of other units
Synoptic Diagram of other units
User Manual SG Series 400 & 500 UL S2
Continue
Page 59/79

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

500Sg 400Sg 500

Table of Contents