10. Route the AC cable (customer supplied) under the server and connect it to
the terminals in the AC connection box. See Figures 18 and 19.
Figure 18. Routing the AC Cable to the AC Junction Box
Figure 19. Connecting the AC Cable to the AC Junction Box
11. Install the cover on the AC connection box using the four screws removed in
Step 10. See Figure 17A.
Before performing the next step, check to ensure all AC
cables are clear of the server slide rails. See Figure 20A.
16 Express5800/1080Xd Installation Procedures
Green wire to TB2 (green screw head)
Black wire to TB1-1
White wire to TB1-2