NEC Express5800 1080Xd Installation Procedures Manual page 14

Hide thumbs Also See for Express5800 1080Xd:
Table of Contents

Advertisement

The server weighs approximately 440.0 pounds (199.6kg). If
the server contains numerous components, it will weigh
more. To avoid personal injury, make sure you have
someone help you unpack and move the server.
Exerting excessive pressure on the server cabinet doors
may damage them. When performing the next step, be sure
to grasp the corner frame of the server when pushing the
server towards the unloading ramp.
14. Position a person at the front of the server (rear of pallet) and one person
standing on the ramp at the rear of the server. Grasp the corners of the
server. Do not put pressure on the center of the front or rear cabinet doors.
See Figure 8.
15. With another person pushing on the front corners of the server, the person
standing on the ramp should stabilize the movement of the server and guide
the server down the center of the unloading ramp. Guide strips are
positioned along the sides of the ramp to prevent the server from falling off
the sides of the ramp. See Figure 8. Remove the server from the shipping
pallet.
16. Once the server is removed from the pallet, remove any bubble-pack and the
shroud that covers and protects the server.
17. With the assistance of another person, move the server to the selected
location in the computer room.
10 Express5800/1080Xd Installation Procedures
!
WARNING
! CAUTION
Figure 8. Rolling the Server Down the Ramp