Connecting Your Master And Protected Servers (Bsus) - NEC Express 5800 User Manual

Express5800 system rack
Hide thumbs Also See for Express 5800:
Table of Contents

Advertisement

Connecting Your Master and Protected servers (BSUs)

To connect your master and protected servers, perform the following steps:
1. As the installation progresses, connect the power cables from individual
system components to the receptacles of the AC distribution panel located in
the rear of the UPS. See Figure 5-8, F.
2. Designate one server to be your master server and connect the black smart
signaling cable (Figure 5-8, C) received with the PowerChute
between a server serial port and the UPS smart signaling port.
3. On your configuration worksheet, note which server and serial port are
connected as master. The System Administrator will need this information
when loading and configuring PowerChute
4. Using the gray simple signaling cable (Figure 5-8, A) from the interface kit,
connect the server(s) being protected to the basic monitoring ports 1 and 2 of
the interface expander accessory.
5. On your configuration worksheet, identify each protected server and its
connection to the basic monitoring ports.
6. Deliver the configuration worksheet to the System Administrator. This
information is required to properly configure PowerChute
5-10 Installing Rack Components
®
plus option,
®
plus software.
®
plus software.

Advertisement

Table of Contents
loading

This manual is also suitable for:

42u36u27u

Table of Contents