Introduction

The steps required to prepare your rack are:
Unpack and inventory your rack and its system components.
!
Remove the doors and side panels from the rack to simplify the assembly
!
of rack components.
Position and level the rack(s).
!
Install one or more rack frame link kits when assembling multi-rack
!
systems.
Attach the front stabilizer when your rack is in its permanent location.
!

What You Need

In addition to the materials shipped to you and standard hand tools, you will
need:
a level for leveling the rack and an adjustable wrench to lower and secure
!
the leveling feet
an adjustable wrench or ratchet set to attach the stabilizer to the base of
!
the rack
a #2 and #3 Phillips-head screwdriver to assemble rack-mounting
!
hardware, and
if you are assembling a multi-rack system, you will need a six foot step-
!
ladder
It is strongly recommended that two people be present when
assembling the rack and installing system components.