3.10 Operation Control

* Items Performed Here
- ON / OFF of the unit, the operation mode and setting the temperature can be performed in the same
manner as a remote controller.
3.10.1 Screen Transfer Operation
(1) Click on
(2) Click on the unit to be controled.
(3) The Operation Control Screen will be appear. This display shows the current conditions.
3.10.2 Screen Functions and Operation (Indoor unit, LOSSNAY unit)
(1) Set each desired [Item].
(2) After setting the operation item, click on
* The item will not be transmitted if a "check" is
removed. Please remove a check if needed.
* Click on
resets a filter sign will transmit.
* If "
" is chosen,
operation can do the whole system in a package.
(Only four items of ON/OFF,Mode,Temp.Set,and Fan.)
However, [Operation(ON)] cannot be operated.
(3) Click on
Address Change Screen will appear.
Refer to [3.8 Malfunction Log 3.8.2 (1)]
(4) "Menu Bar"
[Help] appears in the menu bar.
Click on [Help] and an explanation of the "Operation Method" will appear.
[Refer to 3.6 Connecting Information 3.6.2 (2)"Menu bar"]
(5) Click on
NOTE:
When LEV OPENING is changed, to prevent failure to release the LEV opening after test run, close
the operation control screen. This release the LEV opening on this screen automatically.
However when moving to the operation control screen from the operation monitor screen, the LEV
opening will be retained even by closing this screen.
At a timing when finishing the operation monitor screen, the LEV opening can be released.
from the function selection buttons on the Main Screen.
and the command which
and the
to end the Operation Control Screen.The Main Screen will return.
.