Download Print this page

Remove The Cover(S) - ABB ACH580-01 Quick Installation And Start-Up Manual

Ul type 4x (ip66) drives, nec types

Advertisement

Put the drive on the wall and tighten the screws
1

6. Remove the cover(s)

7. Optional - remove and replace the cable/conduit box (to modify holes) - 4 screws
1
8. Attach a residual voltage warning sticker to the drive in the local language
To the control panel mounting platform.
9. Make sure that the drive is compatible with the grounding system
You can connect all drives to a symmetrically grounded TN-S system (center-grounded wye) without any modifications to
the built-in EMC filter or varistors. If you install the drive to a different system, reconfigure the EMC and VAR screws as
shown in the table below. The table also shows the optional modifications available.
Frame
Connection
TN System
size
NEC
(B066)
Default
R1...R3
EMC (DC)
None or plastic Metal
VAR
Metal
1)
Metal screw must not be used.
2)
Optional, for better noise filtering.
3)
NEC (UL) drives (+B066) have these screws installed by default.
4)
IEC drives (+B063) have these screws installed by default.
2
8 screws (Pozidriv #2)
Tighten to 1.8 lbf-ft (2.5 Nm)
8 screws (Pozidriv #2)
Tighten to 2.5 Nm(1.8 lbf-ft)
WARNING! Cable box screws must be correctly torqued to ensure a
water-tight seal.
Use: Hand tool with Pozidriv #2 bit
Torque: 2.5 Nm(1.8 lbf-ft)
DO NOT OVER-TORQUE!
TN System
Corner-grounded delta
IEC
and Midpoint-grounded
(B063)
delta system
3)
4)
Default
2)
None or plastic
Metal
None or plastic
3
Hand tool only!
IT system
1)
1)
None or plastic
1)
None or plastic
3
No power tools!
TT system
1)
None or plastic
1)
None or plastic

Advertisement

loading
Need help?

Need help?

Do you have a question about the ACH580-01 and is the answer not in the manual?

Questions and answers