ISD Post-Installation Checklist
Refer to Post Installation Checklist to review installation. If you should experience Low Or No VL Ratio during the
Operability test, additional information on those results is discussed after the checklist.
SERVICE COMPANY NAME
SERVICE TECHNICIAN
TRAINING LEVEL (CIRCLE ONE):
STATION NAME
STATION ADDRESS
WARNING!
Before installing any vapor recovery equipment the installer must be familiar with all state and federal
regulations regarding the safe installation and operation of each component. (NFPA 30A).
A Technician Certified Veeder-Root contractor or Authorized Service Contractor (ASC) with Veeder-Root
ISD/PMC Certification must be available (on-site) to over-see this post-installation checklist.
Review and comply with all the safety warnings in the installation manuals and any other national, State
or Local requirements.
For a complete list of precautions, please consult the Veeder-Root ISD manuals.
Required Reference Manuals
TLS-350 In-Station Diagnostic Install, Setup and Operation, Manual No. 577013-800
TLS-350 In-Station Diagnostic System Troubleshooting Guide, Manual No. 577013-819
TLS-350 ISD Install, Setup & Operation Manual for VST ECS Membrane Processors and Veeder-Root
Vapor Polisher, Manual No. 577013-937
Tools Needed
The following program is available and provided to Technician Certified contractors with Veeder-Root
ISD/PMC Certification:
ISD PC Setup Tool, V-R P/N 332333-001 (requires a laptop with the appropriate cabling to make an
RS-232 connection to the Veeder-Root TLS Console)
DATE
TELEPHONE
VEEDER-ROOT TECH CERTIFICATION #
ISD TRAINED?
2/3 OR
4
CITY
3
STATE ZIP
Need help?
Do you have a question about the TLS-350 and is the answer not in the manual?
Questions and answers