Installation Diagram:
Step 1:
•
Place the 'Fixing Brackets' over
the hot & cold outlets then using
a pencil, mark the fixing points to
the wall ready for drilling. Ensure
the markings are level.
Step 3:
•
Place the 'Fixing Brackets' over
the outlets. Using the 'Screws'
provided, fix the brackets to the
wall by screwing into the 'Rawl
Plugs'. Check that the brackets
are level using a spirit level.
Step 5:
•
Turn on the mains water supply,
check all joints and connections
for any leaks. Ensure the water
flow and temperature control are
functioning correctly.
V4.05.24
Step 2:
•
Place the 'Fixing Brackets' to one
side. Using an appropriate sized
drill bit, carefully drill the holes in
the wall. Ensure that there are no
hidden pipes/cables behind the
wall markings. Insert the 'Rawl
Plugs' provided into the drilled
holes.
Step 4:
•
Slide the 'Washers' and 'Cover
Caps' over the 'Fixing Plates'.
Connect the 'Bar Valve' to the
brackets, tighten the 'Bar Valve'
with a wrench.
Need help?
Do you have a question about the Chatsworth Chatsworth and is the answer not in the manual?
Questions and answers
Hot a cold inlets, hot left, cold right,?