Holding Bracket For Toe-Kick - Miele Little Giants PWM 908 LW Operating And Installation Instructions

Table of Contents

Advertisement

Installation and connection

Holding bracket for toe-kick

The holding bracket prevents the wash-
ing machine from falling off the toe-kick
during operation.
Fastening with the holding bracket is
only intended for toe-kicks made from
concrete. The toe-kick must be flat and
level. The surface below the toe-kick
must be able to withstand the physical
loads.
Prior to installation, check whether the
toe-kick complies with the minimum di-
mensions.
Height: 2 3/8" (6 cm)
Width: 23 5/8" (60 cm)
Depth: 25 9/16" (65 cm)
Positioning the holding bracket
Risk of injury from sharp edges.
The holding bracket has sharp
edges. You could cut yourself on the
edges.
Take care when handling the holding
bracket.
Wear gloves while installing the hold-
ing bracket.
The front appliance feet must protrude
by at least 1/8" (3 mm). The washing
machine must already be aligned (see
"Installation – Aligning the washing
machine")
76
 Place the holding bracket on the front
appliance feet.
 Mark the position of the front edge of
the holding bracket with a pencil.
 Remove the holding bracket from the
feet.
 Carefully move the washing machine
until you have enough space to install
the holding bracket.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Little giants pwm 908Little giants pwm 908 el dp

Table of Contents