Installation Instructions; Connections - Hitachi CHL-BAC-01 Instruction Manual

Bacnet gateway for chiller
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7

INSTALLATION INSTRUCTIONS

4 INSTALLATION INSTRUCTIONS
Check installation instructions inside the USB Pen Drive Memory.

5 CONNECTIONS

2
PMML0357B rev.0 - 03/2015
No.
Description
LED2: Operation led indicator
X4: H-link connector (2 screw terminals). Communication bus
with HITACHI units
LED: Operation led indicator
ON: Operation led indicator
ETH: BACnet IP (RJ45)
Power supply (1~ 230V + Earth)
PC console: Configuration port (DB9-RS232)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Chl-mbs-028e500027

Table of Contents