Installation; Installation Preparations - Huawei FusionCharge AC User Manual

Table of Contents

Advertisement

Installation Precautions
Before installation, carefully read the
precautions in this manual and prepare for the

installation.

Only professionals with local qualifications are
allowed to disassemble and install chargers.
Ensure that all installation operations are performed
correctly to avoid accidents such as fire and electric
shock.
Ensure that the installation surface is solid enough
to hold the charger. It is recommended that the wall
have a bearing capacity of at least 100 kg.
Ensure that the wall is flat and reserve sufficient
space around the installation position to ensure
good ventilation.
Ensure that the wall is larger than the rear cover of
the charger.
When installing the product, install the ground cable
first. When uninstalling the product, remove the
ground cable last. Do not work on the product in the
absence of a properly installed ground cable.
Do not install or remove power cables with power on.
Before switching on the upstream RCBO, ensure that
cables are correctly connected to the charger.
After the upstream RCBO is switched on, do not
touch the terminals on the rear cover directly or with
conductors.
Use cables that comply with local regulations and
ensure that the insulation layer is intact.
When installing the product, use a screwdriver with
a proper torque to tighten the screws. When using a
screwdriver, ensure that the screwdriver does not tilt
and the torque error does not exceed 10% of the
specified value.
When routing power cables, ensure that there is no
coiling or twisting.
Keep cables at least 30 mm away from
heat-generating components or heat source areas.
6
Do not join or weld power cables. If necessary, use a
longer cable.
Seal unused power cable holes with rubber plugs
after the installation is complete.
Scan the QR code to get the installation video.

Installation Preparations

Before the installation, ensure that:
The charger power is within the allowed load range of the residence.
Cables and RCBOs meet the installation and usage requirements.
If the AC input power cable exposed to the outdoor environment is 3 m or longer, consult the local installer. You are
advised to install a surge protective device (SPD) at the upstream of the charger's RCBO. The SPD specifications
should meet the following requirements: Uc = 385 V AC, In ≥ 10 kA, and Up ≤ 2 kV. The cable between the SPD and
charger must be at least 3 m.
A network cable that is long enough is prepared if the charger is connected to a wired network.
The installation area should be covered by a wireless network if the charger is connected to the network through WiFi.
If the PV power preferred mode and power equalization function are used, you need to configure an electricity meter.
Scan the QR code in "About This Manual" and see detailed information about the meter in "Meter Description."
Preparing Tools
Personal protective
Safety helmet
equipment
Phillips insulated torque
Hardware installation
screwdriver (M4/M5/M6)
tools
Marker
Cable installation tools
Wire stripper
Clamp meter
Measurement instruments
Insulation tape
Auxiliary materials
Preparing Cables
Cable Type
AC input power cable (single-phase three-wire)
AC input power cable (three-phase five-wire)
Note: To facilitate cabling, aluminum wires and solid copper wires are not recommended.
Preparing an RCBO
Input
Specifications
Single-phase /
4P RCBO, 40 A (50 A is recommended if the ambient temperature is higher than 45°C), Type A or B,
Three-phase
in compliance with local regulations.
Protective gloves
Insulated shoes
Insulated security torx
Hammer drill and
torque screwdriver (TT20)
drill bit (Φ10)
Rubber mallet
Crimping tool
Scissors
Steel measuring tape
Level instrument
Heat-shrink tubing
Cord end terminal
Operating Current
Cross-sectional Area
6~10 mm
2
32 A
6~10 mm
2
7