Control Box Installation
4
Connect the transmission and power wires between the
base heater control box and the outdoor unit control box.
Secure the wires with the factory installed wire holders.
Transmission Line
Power Line
Transmission wires
(Main PBA CN807)
Power supply
wires
Base heater
power wires
CORRECT
※ IMPORTANT
When screwing the terminals together. arrange them back to
back so that there will be no gap left between them as shown
in the figures below.
8
English
DB68-12029A-00_IM_ACC BASE HEATER Control KIT_AA_EN.indd 8
INCORRECT
Transmission Line
Power Line
Transmission wires
(Main PBA CN807)
Power supply
wires
Base heater
power wires
CORRECT
INCORRECT
※ IMPORTANT
When screwing the terminals together. arrange them back to
back so that there will be no gap left between them as shown
in the figures below.
2022-09-06 오전 11:43:23