Installing The Control Box [Dvm S2 Series] - Samsung AVR-M200FHAX Installation Manual

Base heater control kit
Table of Contents

Advertisement

Installing the control box [DVM S2 Series]

1
Fasten the bracket to the control box's body using the
supplied screws. The bracket should be installed on the
left of the control box.
Installation in a DVM S2 model
2
Mount the control box in the outdoor unit as below figure.
Installation in a DVM S2 Small model
Installation in a DVM S2 Large model
DB68-12029A-00_IM_ACC BASE HEATER Control KIT_AA_EN.indd 7
Installation in a DVM S2 X-Large model
3
Fasten the control box to the outdoor unit with supplied
screws (3EA) for assembly.
<DVM S2 Small>
<DVM S2 Large>
<DVM S2 X-Large>
English
7
2022-09-06 오전 11:43:22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avr-m200jhax

Table of Contents