Download Print this page

Samsung CNH HDB Series Technical Data Book page 88

Single, low ambient line up for america r410a, cooling only
Hide thumbs Also See for CNH HDB Series:

Advertisement

Installation
4 Way Cassette
Level
7 Adjust the unit to the appropriate position, taking into
account the installation area for the front panel.
• Place the pattern sheet on the indoor unit.
• Adjust the space between the ceiling and the
indoor unit by using a Tape measure.
• Fix the indoor unit securely after adjusting the level
of the unit by using a level.
• Remove the pattern sheet and install the front
panel.
When the installation template is made of paper
4 way Cassette
Indoor unit
0.67 inch (17 mm)
0.79 inch (20 mm)
Ceiling
Gauge of dimensions
Installing the drain hose and drain pipe
1 Push the supplied drain hose as far as possible over
the drain socket.
2 Tighten the metal clamp as shown in the picture.
3 Wrap the supplied large sealing pad over the metal
clamp and drain hose to insulate and fix it with clamps.
4 Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope,
fit the hose with drain raising piping (field supply).
5 Push the drain hose up to insulation when connecting
the drain hose to drain socket.
4 way Cassette
Metal clamp
Large sealing pad
Drain hose
Drain socket
Drain hose
Drain pipe
Be sure to bond the drain
hose and the main pipe.
PVC Tube Joint
+VP25 (OD: 1.26 inch (32 mm), ID:
0.98 inch (25 mm))
Drain pipe

Hide quick links:

Advertisement

loading