Samsung 310 5G CPE Installation Manual page 26

Hide thumbs Also See for 310 5G CPE:
Table of Contents

Advertisement

Category
Check Items
Power
Installation status of power
supply
Installation of circuit
breaker
Cable specification
Cabling
Cable binding status
Cable connection
Installation status of cable
tag
Other data
Cable specification
cables
Cabling
Cable binding status
Cable connection
Installation status of cable
tag
Others
Reserved ports
5G Indoor CPE Installation Manual
Copyright © 2018, All Rights Reserved.
Criteria
Power supply capacity
Output voltage (tester)
Checking circuit breaker capacity
Checking the specification
Checking the limit distance
Cable damage
Proper installation route
Compliance with the radius of curvature
Binding status
Binding interval
Checking binding materials
Checking cable connection (Pin Map)
Input voltage
Assembly condition of a pressure
terminal and connector
Tightening condition of a pressure
terminal and connector
Checking compliance with tightening
torque value
Position
Marking content
Checking tag installation method
Checking the specification
Cable damage
Proper installation route
Compliance with the radius of curvature
Binding status
Binding interval
Checking binding materials
Checking cable connection (Pin Map)
Assembly condition of a connector
Tightening condition of a connector
Checking compliance with tightening
torque value
Position
Marking content
Checking tag installation method
Checking port cap tightening status
• Indoor: Dust cap
• Outdoor: Water proof cap
Confidential
Result
Pass
Fail
17

Advertisement

Table of Contents
loading

Table of Contents