Page 1
SmartLi 1.0 User Manual Issue Date 2023-03-26 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document About This Document Purpose This document describes the SmartLi 1.0 intelligent lithium battery cabinet (lithium battery cabinet for short) in terms of its overview, technical specifications, installation, cable connections, operation guide, and maintenance. Figures provided in this document are for reference only.
5 Installation and Cable Connection 5.2.3.4 Remote EPO NO TICE ● Huawei does not provide the EPO switch or cable. Prepare them by yourself. The recommended cable is 22 AWG. ● Equip the EPO switch with a protective cover to prevent misoperations, and protect the cable with a protective tube.