N68-22 Cabinet Installation Guide
Overview
This document contains information related to the installation of the N68E-22 cabinet. The
information consists of how to install the cabinet, accessories, external power cables, and PGND
cables, how to attach engineering labels to the power cables and PGND cables, and other
reference information.
Product Version
This document applies to all the versions of the following products: eCoordinator, BSC6910,
and BSC6900.
Intended Audience
This document is intended for installation personnel.
Organization
1 Changes in the N68E-22 Cabinet Installation Guide
This chapter describes the changes in the N68E-22 Cabinet Installation Guide.
2 Overview of the N68E-22 Cabinet
The N68E-22 cabinet features a modular design. It provides sufficient space for installing
devices such as subracks to facilitate capacity expansion and maintenance. Among the main
parts of a cabinet, load-bearing parts include front and rear columns of the racks, middle columns,
and door frames. Other parts cannot bear load, including mounting bars, front and rear doors,
wooden plates on both sides of the cabinet, front and rear wire bushings, and guide rails.
3 Preparing for the N68E-22 Cabinet Installation
Before installing the N68E-22 cabinet, you need to unpack the cases and check the items in the
cases. Ensure that all the tools required for the installation are available.
4 Installing the N68E-22 Cabinet
Issue 01 (2013-01-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
About This Document
About This Document
ii

Advertisement

loading

This manual is also suitable for:

N68e-22