Ad J U S T I N G T He Ga S Fl O W Ra T - Panasonic YD-200KR Operating Instructions Manual

Thyristor controlled mig/mag arc weldingpower source
Table of Contents

Advertisement

CHECKS AND PREFARATIONS PRIOR TO OPERATION
 Adjusting the Gas Flow Rate
Switch Box
Flow Meter
Gas Regulator
Earthing
Terminal
Turn on the switch
1
of
the switch box.
④Open the main valve of the gas bomb. (Prior to
Primary
Pressure Gauge
Flow Rate Control Knob
Gas Bomb
opening it, make sure that a flow rate control
knob is turned to the SHUT side)
⑤Turn the flow rate control knob
gradually toward OPEN so that a flow
meter indicates a required value.
12
③Set the GAS SUPPLY
switch to CHECK.
④Set the GAS SUPPLY
switch to WELD.
Welding Power Source
②Turn on the POWER
switch
BASICS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yd-350krYd-500kr

Table of Contents