Loading Cart And Transfer Carriage Instructions: Loading; Figure 6-1. Transfer Carriage And Loading Cart - Amsco Evolution Series Operator's Manual

Steam sterilizers
Table of Contents

Advertisement

6.4 Loading Cart and
Transfer Carriage
Instructions: Loading
Hand Crank
Transfer
Carriage
Loading Cart
Sterilizer Operation
1. Open sterilizer door.
2. Verify loading cart is properly aligned upon transfer carriage.
3. Align front end of transfer carriage with dock at base of sterilizer.
(See
4. Roll carriage forward until latches engage with dock.
5. Press forward on carriage handle, transfer carriage latches to
dock as cart begins pushing into chamber.
6. Carefully push cart into chamber.
7. Once cart is fully inserted, turn hand crank (See
Figure
(disengaging the cart from carriage).
8. Pull carriage away from sterilizer chamber. Loading cart remains
in chamber.
9. Once transfer carriage is fully extracted from chamber, it
disengages from dock. Move carriage away from sterilizer.
10. Sterilizer is now ready to run a cycle. Proceed to cycle
description found in

Figure 6-1. Transfer Carriage and Loading Cart

Operator Manual
Figure 6-1
and
Figure
6-2) counterclockwise to lower carriage support arms
S
ECTION
6-2.)
Figure 6-1
6.9, P
C
,
REVAC
YCLES
Transfer
Carriage
Docking
Interface
and
on
6-15.
PAGE
6-7
129390199

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution Series and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF