UPS5000 Optional BSC Card
User Manual
Figure 3-9 Installing cables
(1) Output sampling terminals of the master
system
Step 7 Install the cable between the optional BSC card and the terminal block.
● The 3-bus system is used as an example for systems with 3–5 buses, and the 6-
● If the configured voltage sampling cables are not long enough, use the
● For a system of more than five buses, prepare cables (6-bus system: 1 PCS; 7-
Issue 03 (2022-09-16)
NO TICE
bus system is used as an example for systems with 6–9 buses.
configured cables (BOM number: 25030395), single cord end terminals (BOM
number: 14170097), and phoenix terminals (BOM number: 14120129) to
prepare voltage sampling cables onsite.
bus system: 2 PCS; 8-bus system: 3 PCS; 9-bus system: 4 PCS) onsite using the
configured cables (BOM number: 25030395), twin cord end terminals (BOM
number: 14170136), and phoenix terminals (BOM number: 14120129).
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Terminal block of the master system
3 Installation