Installation; Unpacking And Checking; Installation Tools - Huawei UPS5000 User Manual

Optional bsc card
Hide thumbs Also See for UPS5000:
Table of Contents

Advertisement

UPS5000 Optional BSC Card
User Manual

3.1 Unpacking and Checking

After the product is delivered onsite, unpack it and check the following items:

3.2 Installation Tools

Personal Protective Equipment
Electrostatic
discharge (ESD)
gloves
Issue 03 (2022-09-16)
Visually inspect the appearance of the product for shipping damage. If any
damage is found, notify the carrier immediately.
Check that the fittings comply with the packing list. If there is any
discrepancy, keep a record and contact the supplier immediately.
Insulated gloves
Copyright © Huawei Digital Power Technologies Co., Ltd.
3

Installation

-
3 Installation
-
8

Advertisement

Table of Contents
loading

Table of Contents