Basic Installation and Operation
Guide
Before closing the enclosure, all metal chips, scrap wire and other debris left over from installation must be cleaned out.
If there is an appreciable accumulation of dust or dirt, the enclosure should be cleaned by using a brush, vacuum cleaner
or clean, lint free brush.
The integrity of all bus bar supports must be checked to confirm they are secured and without damage.
Care should be exercised that when covers are installed and doors closed, no wires are pinched and that all enclosure
parts are properly aligned and tightened.
A supply of spare parts, fuses, etc. should be established.
Instruction manuals and diagrams should be collected and filed.
WIRING CHECK
Field wiring should be checked for clearance to live busses where necessary, physically secured to withstand the effects
of fault current. All grounding connections should be checked.
Each motor should be connected to its intended controller, and phase rotation should be correct prior to startup.
Changes made to circuit diagrams during installation should be recorded.
DEVICE/MECHANISM CHECKS
All devices should be checked for damage. All necessary repairs or replacements should be made.
WARNING
Ensure that safety signs are not covered or obscured by paint.
WARNING
The setting of any adjustable current and voltage trip mechanisms should be verified to the proper values.
NOTE: Damage from faults can be reduced if devices used for short circuit and ground fault protection are
chosen and set to operate at values as close to minimum as feasible, while allowing normal transients.
All switches, relays and other operating mechanisms should be manually exercised to make certain that they are properly
aligned and operate freely.
Operating mechanisms such as interlocks, key switches, etc. should be checked for function as intended for protection of
personnel and equipment.
Overload relay settings should be checked to be sure they are selected and adjusted to the proper settings per the load
nameplate data.
TOSHIBA
Do not energize damaged equipment that has not been repaired and verified.
Do not remove, cover or destroy any safety signs.
JKSSS Series Solid State Soft Starters
15
Need help?
Do you have a question about the JKSSS Series and is the answer not in the manual?
Questions and answers