During Installation; During Use - ABB PP882 Hardware And Installation Manual

Compact product suite panel 800 version 6
Table of Contents

Advertisement

During Use

During Installation

The operator panel is designed for stationary installation on a planar surface,
where the following conditions are fulfilled:
Install the operator panel according to the accompanying installation instructions.
Ground the operator panel according to the accompanying installation
instructions.
Only qualified personnel may install the operator panel.
Separate the high voltage, signal and supply cables.
Make sure that the voltage and polarity of the power source is correct before
connecting the operator panel to the power outlet.
Peripheral equipment must be appropriate for the application and location.
In a Zone 2 environment, this equipment shall be installed in an enclosure that
provides a degree of protection not less than IP 54 or greater than IP 65 in
accordance with IEC/EN 600079-0. The IP rating of the equipment is limited to
the IP rating of the enclosure it is to be installed into.
In a Zone 22 environment, this equipment shall be installed in an enclosure
that provides a degree of protection not less than IP 64 or greater than IP 65 in
accordance with IEC/EN 600079-0. The IP rating of the equipment is limited to
the IP rating of the enclosure it is to be installed into.
During Use
Keep the operator panel clean.
Emergency stop and other safety functions may not be controlled from the
operator panel.
Do not use excessive force or sharp objects when operating the touch screen.
14
no high explosive risks
no strong magnetic fields
no direct sunlight
no large, sudden temperature changes
Section 2 Safety Precautions
3BSE069462-600 Rev D

Advertisement

Table of Contents
loading

Table of Contents