Preventive Maintenance, Care and Cleaning
Preventive Maintenance
Mechanical Inspection
Safety Tests
Performance Assurance Tests
Chapter 10 - Preventive Maintenance, Care and Cleaning
Every 12 months, you must carry out a series of preventive maintenance tasks
and performance assurance tests. These ensure that the Telemetry System
continues to perform at its best, and reduces the possibility of failures. The
tasks to be carried out, their sequence, and the estimated time to complete
each one is given in the following table.
No.
1.
Mechanical Inspections
2.
Carry out Safety Tests
3.
Performance Assurance Tests
To carry out a mechanical inspection of the Receiver:
•
Make sure all exposed screws are tight.
•
Make sure the boards and connectors are firmly in place.
•
Check the external cables for splits, cracks or signs of twisting. Replace
any cables that show serious damage.
Complete the safety tests in accordance with national requirements.
See the Instructions for Use for details.
Tasks and Tests
10