Measurement Functions; Support Functions - Mitsubishi Electric EcoMonitorLight EMU4-BD1-MB Manual

Energy measuring unit
Hide thumbs Also See for EcoMonitorLight EMU4-BD1-MB:
Table of Contents

Advertisement

1. Features
4
Measurement Functions
■High-Precision Measurement
The continuous measurement of energy at sampling
cycles of approximately 250 μs allows for measuring
even short-cycle loads such as that for spot or solder
welding.
*Data of measured values, including power use as well as voltage, current and      
  similar items, is acquired at update cycles of 250 ms.
Power [kW]
250μs
Advantage of High-Precision (Short-Cycle) Measurement
It is possible for measurements to be missed when performing
continuous measurement of short-cycle loads because the power
used for spot or solder welding is used for an extremely short
period. The EcoMonitorLight provide high-precision measurement
so that the measurements of short-cycle loads are not missed.
5
Support Functions
■Misconnection Support
This function displays items such as current and voltage
phase angles, and energy, current and voltage values for
each phase. By checking each displayed value, distinction
of whether there is a misconnection in current or voltage
input used for measuring is supported.
Examples of Display
Check Screens
*The above examples are sample images.
Refer to the operation manual for actual screens,
the check method, directions for use, etc.
*Refer to the operation manual for the table for distinction.
5
Power consumption value
 increases momentarily during
spot or solder welding.
Time [t]
Broken lines indicate location
of misconnection.
Example 
of Misconnection
■Operating Time Measurement
The current measurement time can be calculated in
seconds and the equipment operating time can be
displayed in hours (h) in order to utilize the data in
diagnosing production equipment service life and for
performing preventive maintenance.
*Operating time can also be output to the host system as CSV data.
Current [A]
Measure operating time
Operating time measurement
starts
Operating Time Measurement with Specified Inputs as a Trigger 
You can specify contact inputs to the energy measuring unit (High
Performance Model only) as triggers for the start and end of
operating time in order to be able to measure operating time
according to actual equipment operation.
■Test Function
This function enables communication of test data to the
host system without voltage or current input. By enabling
alarm and pulse test signal output, it becomes easy to
check wiring and perform system testing.
Test Data
Output
Pulse/Alarm
Output
Operated when
0.4% or more 
of the rated 
current is used.
Time[t]
Operating time measurement
ends
Host System
Receiving Devices
 (Alarm lights, buzzers, etc.)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecomonitorlight emu4-hd1-mb

Table of Contents