Mitsubishi Electric EcoMonitorLight EMU4-BD1-MB Manual page 30

Energy measuring unit
Hide thumbs Also See for EcoMonitorLight EMU4-BD1-MB:
Table of Contents

Advertisement

9.Device Installation Procedures
IEC Rail Installation (Surface Installation)
JIS-Compliant Dimensions Installation (Front-Surface Installation)
*If the display part protrudes from the plate surface at IEC rail and JIS-compliant form installation,
cut the plate at a point 50 mm or more from door opening/closing support.
Board Installation
Board Installation (Using Board Surface Installation Attachment (EMU4-PAT))
29
Energy Measuring Unit
●Applicable IEC Rail
●Installation
  (35mm)
①Pull the IEC rail stopper
 of the main unit downward.
仮写真
7.3 or more
③Push
●JIS-Compliant Shape
●Installation
   Installation Plate
①Check that the IEC rail stopper
of the main unit is on the upper side.
Hook
Installation Plate
Fitting Spring
③Press the main unit downward to that
the fitting spring is inserted into the
groove on the bottom of the main unit.
●Panel Cutting Dimensions
The panel cutting dimensions are as shown below.
Panel thickness allowable for installation is 1.6 to 4.0 mm.
Main Unit External Shape
●Panel Cutting Dimensions
The panel cutting dimensions are as shown below.
Panel thickness allowable for installation is 1.6 to 4.0 mm.
Main Unit External Shape
●Removal
②Hooks
IEC Rail
②Pull up
④Push the IED rail
 stopper upward.
●Removal
②Hook the grooves (three
locations) on the upper
part of the main unit
onto the hooks of the
installation plate.
②Lightly lift the bottom of
①Press down the fitting spring.
the main unit and pull out
in the reverse order of the
installation procedures.
●Installation Procedures
Install the screws (M3 X 10) to the installation plate.
Tightening torque: 0.63 N/m
Installation Screws
Installation Plate
Recommended
Cross-recessed head machine screw with spring
Installation Screws
and plain washers JIS B 1188 M3 x 10, Two screws
●Installation Procedures
Install to the installation plate using the installation screws
(M3 x 10) and install the board surface installation attachment.
Tightening torque: 0.63 N/m
Installation Screws
Board Surface
Installation Attachment
*Tighten the attachment with the screws in an environment with a large amount of vibration.
*The installation screws and attachment fixing screws are packaged with the attachment (sold separately).
①Press against the main unit
using your hand so that it
does not fall, and pull the
IEC rail stopper downward.
Attachment Fixing Screws
Installation Plate

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecomonitorlight emu4-hd1-mb

Table of Contents