Download Print this page

Cub Cadet 14W-3GEC010 Operator's Manual page 28

Advertisement

8.
Pull the deck support pin outward to release the deck from
the lift arm. See FIg. 7-4.
9.
Repeat the above steps on the tractor's right side.
10.
Move the lift lever into the top notch to raise the lift links
up and out of the way.
NOTE: On models with electric lift, place the cutting height
lever in the L position and use the lift switch to raise the lift
links up and out of the way.
11.
Gently slide the cutting deck toward the front of the
tractor, carefully guiding the hooks on the deck off the
front hanger.
12.
Gently slide the cutting deck (from the right side) out from
underneath the tractor.
NOTE: For larger decks it may be necessary to turn the
wheels to remove the deck.
Mounting the Deck
WARNING!
parking brake and remove the ignition key before
mounting the cutting deck.
1.
Place the lift lever in the notch for highest cutting position
to raise the lift links up and out of the way.
NOTE: On models with electric lift, place the cutting height
lever in the L position and use the lift switch to raise the lift
links up and out of the way.
2.
From the right side, carefully slide the cutting deck under
the tractor.
NOTE: Carefully positioning a piece of 2x4 under the
center, rear of the cutting deck to raise it up slightly will aid
in completing the following steps.
28
S
7— S
ection
ervice
Figure 7-4
Turn the tractor's engine is off, set the
3.
Align the tractor's lift links with deck support pins found
on the rear deck brackets. See Fig. 7-5.
Figure 7-5
4.
Use the lift switch to lower the lift links into the lowest
cutting position.
5.
Locate the deck support pin found on the left bracket and
pull it outward. Align it with the hole in the lift link before
releasing it to secure the pin in place. Repeat on the right
side of the deck. See Fig. 7-6.
a
c
Figure 7-6
b

Advertisement

loading

This manual is also suitable for:

Gtx2154le