NEC E120e-M User Manual page 70

Table of Contents

Advertisement

Chapter 2 Preparations
Left server module
Right server module
15. Connect the FBU cable (600 mm) of which
one end was connected with RAID
Controller in Step 6 to FBU, as shown in the
figure.
70
Cooling sponge
FBU
Excess length of cable
Excess length of cable
FBU cable
Express5800/E120e-M User's Guide
1. Installing Internal Optional Devices
Pass the FBU cable under the
power cable (black and yellow).
FBU

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 seriesN8100-2103fN8100-2104f

Table of Contents