The front plinth panel is screwed to the rear panel and the rear plinth
panel is located under the machine cover and they are both to be
mounted after installation. The screws for this are in the accessory
pack.
Keep the transit bars in a safe place. They need to be reinstalled
should the machine ever need to be moved again.
Transport the machine on a pallet truck inside the room.
Do not move the machine until all casing parts have been installed.
Installing the machine on ships
On other types of floor structures (in cases where the machine is be-
ing installed on sea-going vessels, for example), the fixing materials
must be provided on site.
For installation on sea-going vessels, the machine must be secured to
prevent slipping and tipping by fastening it to the floor of the vessel
(e.g. using clamps that are welded to the floor of the vessel).
All 4 of the machine's feet must be secured.
Installation
63