Equipment Checklist - Mitsubishi Electric Ecodan HUS210FTC4ST Installation Manual

Pre-plumbed cylinder with ftc4 control system
Table of Contents

Advertisement

Equipment Checklist

3
You will receive the following components fitted to every Mitsubishi Electric Pre-plumbed Cylinder
Factory Fitted Components
FTC4 Control Centre
Zone Valves x 3*
UPS2 25-60 Pumps x 2
Inlet Control Valve
Filling Loop
3kW Immersion Heater
TF1 Compact Filter
Auto Bypass Valve
Temperature and Pressure Relief Valve
Automatic Air Vent
Thermistor Pockets
Tundish
THW5 Dual Cylinder Thermistor
THW1 & THW2 Flow and Return Thermistors
THW6,7,8 and 9 Flow and Return Thermistors**
* 2 on HU150FTC4ST
** not on HU150FTC4ST
Supplied Loose Components
Main Controller
Flexible Connection Pipes
Flow Setter Valve
Expansion Vessel (White)
Manuals
Warranty Card
FTC4 Installation Manual
6
Optional Components
Fix It Foot
PAC-SE41TS-E Wired Thermistor
Fernox HP-5C Antifreeze containing biocide 10 Litre
Fernox HP-5C Antifreeze containing biocide 25 Litre
PAR-WT50R-E Wireless Remote Controller Transmitter
PAR-WR51R-E Wireless Remote Controller Receiver
PAC-TH011HT-E Fossil Fuel Boiler Thermistors
PAC-TH011-E Pair of 2 Zone Sensors (2 pairs required)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecodan hus250ftc4stEcodan hus300ftc4st

Table of Contents