UPS5000 Top Air-flow Cabinet
User Manual
Figure 3-6 Removing the side panel from the top air-flow cabinet
Step 8 (Optional) If the UPS is installed against a wall, move the UPS cabinet combined
with the top air-flow cabinet to the installation position. If the antiseismic kit is
configured for the UPS, secure the antiseismic kit to the ground from the side of
the top air-flow cabinet.
Step 9 Install the bottom plates.
Figure 3-7 Installing the bottom plates
----End