Advertisement

Quick Links

UPS5000-S-880 kVA Quick Guide
(CMI)
Issue: 01
Date: 2019-04-09
1
Product Overview
Model
UPS5000-S-880K-SM
UPS5000-S-880K-SM
1. Before installation, read the user manual carefully to get familiar with product information and
safety precautions.
2. Use insulated tools when installing the equipment.
3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain
the UPS. Otherwise, personal injury or equipment damage may occur, and the resulting UPS
faults are beyond the warranty scope of Huawei.
4. This document describes the installation procedure for a single UPS. For details about how to
install a parallel system, contact Huawei technical support.
Copyright © Huawei Technologies Co., Ltd. 2019. All rights reserved.
Weight
Dimensions (H x W x D)
1550 kg
2000 mm x 2400 mm x 850 mm
1
(1) Power module
(2) Control module
(3) Maintenance bypass
switch
(4) Power distribution
module cover
(5) Bypass module

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000-S-880K-SM

  • Page 1 2. Use insulated tools when installing the equipment. 3. Only engineers certified by Huawei or its agent are allowed to install, commission, and maintain the UPS. Otherwise, personal injury or equipment damage may occur, and the resulting UPS faults are beyond the warranty scope of Huawei.
  • Page 2: Installing The Ups

    800 mm and secure the channel steel to the floor using expansion bolts. Huawei does not provide channel steel or expansion bolts used for securing channel steel. The customer should purchase channel steel (recommended width: 50 mm or more) and expansion bolts.
  • Page 3 1. Move the UPS to the installation position and open the front door of the power cabinet. 2. Install the connecting plates between the bypass cabinet and its adjacent power cabinet based on the following sequence: bottom, top, and middle connecting plates. 3.
  • Page 4 4. Install anchor baffle plates. 5. Remove the front cover of the power distribution subrack from the bypass cabinet, and remove the rear covers from the bypass cabinet and its adjacent power cabinet. 7. (Optional) Remove the extension rod of the 6.
  • Page 5 8. Cut off the cable ties binding holes of copper bars 9. Remove the filler panel from the numbered 23, 24, 25, 26, and 30. Install the soft power cabinet, and install the soft copper bars in the bypass cabinet and its adjacent copper bar numbered 52.
  • Page 6 A UPS in 880kVA configuration has only one switch cable (maintenance bypass switch).
  • Page 7: Connecting Cables

    Connecting Cables 1. This document describes cable routing by removing the top cover when there are two mains inputs. 2. In the case of single mains, you do not need to connect bypass input power cables and remove short-circuit copper bars. UPS Cable Connection Reference •...
  • Page 8: Installing Cables

    Installing Cables Scenario 1: Routing Cables from the Top 1. Remove the covers from the top of the cabinet, drill holes into the covers for the power cables and battery cables, attach grommet strips on the hole edges for protecting cables, and reinstall the covers.
  • Page 9 5. Connect the output power cable. 6. Connect the bypass input power cable. 7. Connect the battery cable. 8. Connect the signal cable. NOTE The figure shows the signal cable routing and is for reference only. Connect the cable based on the actual 9.
  • Page 10: Verifying The Installation

    Scenario 2: Routing Cables from the Bottom 1. Remove the cable covers from the bottom of the cabinet, drill holes in the covers, attach grommet strips to the hole edges for protecting cables, and reinstall the cable covers. 2. Connect power cables and signal cables. For the screw specifications and torque used for connecting cables in a bottom cable routing scenario, refer to the top...
  • Page 11: Powering On And Starting The Ups

    138–485 V AC, and the frequency range is 40–70 Hz. Powering On the UPS Close the upstream bypass and mains input switches. After the UPS is powered on, initialization begins. The MDU displays the Huawei logo and an initialization progress bar. Starting the Inverter...
  • Page 12 Initial Startup a) If this is the initial startup, set the language, time, date, network parameters, and system parameters on the Settings Wizard screen. b) After you set parameters on the Settings Wizard screen, the MDU displays the Bypass mode and No battery alarms, which do not need to be handled.
  • Page 13 Download the mobile phone app (Service Expert). Use the app to start the inverter No, start the online? inverter offline Insert the WiFi module into the USB port on On the MDU, choose System Info > the MDU. Set System Info > Settings > Maintenance >...
  • Page 14: Shutting Down The Ups

    3. In the displayed dialog box, tap Yes to shut down the inverter. Powering Off a Single UPS Open the downstream output switch and battery string switch. Open the upstream mains input and bypass input switches. HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China www.huawei.com...

Table of Contents