Mechanical Installation; Siting Requirements - ABB ZDT Installation And Operating Manual

High temperature version, for use with zgp2 probes
Table of Contents

Advertisement

3 MECHANICAL INSTALLATION

3.1 Siting Requirements – Fig. 3.1
The instrument is designed for wall mounting and weighs approximately 9kg (20lb).
Maximum
100m (330ft.)
A – Close to Oxygen Probe
C – Avoiding Vibration
damage
contaminated liquid or vapour
is allowed to reach the probe.
D – Avoid Harmful Vapours and Dripping Fluids
4
Probe
B – At Eye Level
Caution. Permanent
may
occur
if
Fig. 3.1 Siting Requirements
55°C
Max.
–5°C
Min.
Note. The
retransmission
output operates to specification
within the range –20°C to +70°C.
E – Within Temperature Limits
IP66
(NEMA 4x)
F – Within Environmental Limits

Advertisement

Table of Contents
loading

Table of Contents