1

Preparing the Machine

No Parts Required
Procedure
1.
Park the machine on a level surface.
2.
Engage the parking brake.
3.
Shut off the engine and remove the key.
4.
Disconnect the negative (black) battery cable
from the negative (-) battery terminal.
2
Installing the Flow Control
Panel
Parts needed for this procedure:
1
Bolt (3/8 x 1-1/4 inches)—30-inch machines only
1
Locknut (1/4 inch)—30-inch machines only
1
Bolt (1/4 x 5/8 inch)—30-inch machines only
3
Bolt (5/16 x 3/4 inch)—24-inch machines only
3
Locknut (5/16 inch)—24-inch machines only
Procedure
1.
Hold the flow control panel against the right
side of the machine to determine the mounting
hole configuration. Remove and retain the
mounting hardware from where the bracket will
be installed on the machine.
Outer cover hidden for clarity
1. Installation for 30-inch
machine
2. Locknut (1/4 inch)
3. Bolt (1/4 x 5/8 inch)
4. Bolt (3/8 x 1-1/4 inches)
2.
Place the flow control panel onto the machine
and secure it using the hardware shown in
Figure
3.
Note:
Additional hardware is shipped with the
spreader if the retained hardware is not long
enough to mount the control panel.
7
Figure 3
5. Reuse retained hardware
6. Installation for 24-inch
machine
7. Hex-head bolt (5/16 x 3/4
inch)
8. Locknut (5/16 inch)
g238611