Step 3: Assemble the side wall panels
Place 14M the sheeting on your worktable and tap or slide in 21F top channel and 21B
bottom channel. Fix and position the 32E mid wall channel by the self-tapping screws. Fix
21B the bottom channel by the self-tapping screws but not those depicted crossed in this
stage. Be noted that the small lip of the channel is always facing out. This is to ensure that
rainwater cannot build up inside your shed. Repeat the same steps for the other side wall.
Original Language Version
Gss150815/G | issue 2 (i) 21/04/17
© Jack sealey limited