Unpacking - NorthStar 4065 Installation, Operation And Maintenance Manual

Trencher
Table of Contents

Advertisement

Closely inspect all contents in the shipping carton.
-If you have missing or damaged components then: Contact Product Support at 1-800-270-0810.
Due to the weight of the trencher, two people are needed to unpack. The following procedure prepares the trencher for
towing.
1.)
After removing the packaging material that secures the trencher to the shipping pallet, add gas and oil to the engine.
Fill engine crankcase with 10W-30 motor oil and fill gas tank fresh gasoline. Start the engine and set at half-throttle.
2.)
Lift the boom up by pulling lever #3.
3.)
There are two travel pins in the base of the boom that will snap with any movement other that straight up. Remove
the up-down and side-to-side travel pins from the base of the boom assembly. Keep these two pins to re-insert for
towing.
4.)
Lower the boom to the ground by pushing lever #3 and continue to lower the boom until it raises the boom end of the
trencher off the ground 4-5 inches.
5.)
Insert the wheels in the front (boom end) of the frame. This is the proper position of the wheels for towing. Secure
the wheels to the frame with the pins and pin clips provided.

Unpacking

1 2
3
4
side-to-side
travel pin
3
fig01381
up-down
travel pin
fig01382
fig01383

Advertisement

Table of Contents
loading

Table of Contents