Download Print this page

Sealey GSS3030G Instructions Manual page 11

Galvanized steel shed green 3 x 3 x 2.1m

Advertisement

8.2.2. Ensure that the panel is adequately supported in the shaded area (as seen below) when screwing the channel
connectors (66) into place.
8.2.3. Assemble the other side panel in the same way.
8.3.
ASSEMBLE THE ROOF PANELS.
8.3.1. Place 12R, 2 x 12m and 12L onto your work table and fix them together with self tapping screws.
© Jack Sealey Limited
Original Language Version
GSS3030G
Issue: 1 - 28/08/14

Advertisement

loading